Half an hour at Foundry Lane

A few photos of 20073 shunting the sidings at Foundry Lane, here we see it arriving with a brake van, there being no inbound traffic on this afternoon’s trip working

After dropping the brake van in the sidings, the loco headed off to the steel terminal, propelling a bogie bolster which had arrived on the morning trip and returning with some empty wagons which had been unloaded during the morning

The brake van is collected and added to the back of the wagons.  The loco then ran round, ready for the return working

The trip working then left, heading back towards the mainline

We grab one last photo before she disappears under the bridge and into the gloom beyond

The next exhibition appearance for the layout is Expo EM North on 15th and 16th September at the new venue of George H Carnall Leisure Centre, M41 7FJ.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s